GTT receives order for LNG tank design from Samsung Heavy Ind
1/18/2021
Paris - GTT has received an order from the Korean shipyard Samsung Heavy Industries (SHI) for the tank design of a new 174,000 m3 LNGC1 on behalf of the Korean ship-owner Pan Ocean.
GTT will design the tank, which will be fitted with the Mark III Flex membrane containment system. The delivery of this vessel is scheduled for the second quarter of 2023.
This order is the first of the year for GTT. It follows a series of 29 LNG carriers orders received in the second half of 2020. GTT recalls that these orders, except for one, will be delivered over a longer period than usual, spreading over 2023 to 2025.
Sign up to Receive Our Newsletter
- Cheniere signs deal with Bechtel to expand U.S. LNG export capacity
- TC Energy approves $1.5-B Columbia Gas expansion after profit tops estimates
- Baker Hughes’ fuel flexible NovaLT™ 16 gas turbine certified by RINA for marine propulsion
- Commonwealth LNG FID attracts global syndicate of leading banks
- Honeywell and McNeese State University partner to train the LNG workforce of the future

Comments