GTT entrusted by DSME with the design of a FSRU for MOL
6/9/2020
GTT has received an order from the Korean shipyard Daewoo Shipbuilding & Marine Engineering (DSME) for the design of a new floating storage and regasification unit (FSRU1) on behalf of the Japanese ship-owner Mitsui OSK Lines Ltd. (MOL).
The FSRU with a capacity of 263,000 m3 will be fitted with the NO96 membrane cryogenic containment system, a technology developed by GTT. The vessel delivery is scheduled in 2023. It will be located in Wilhelmshaven, Germany.
"We are delighted to be working with DSME and MOL, two very long-term partners, on this new very large capacity FSRU project," Philippe Berterottière, Chairman and CEO of GTT, said.
Sign up to Receive Our Newsletter
- Cheniere signs deal with Bechtel to expand U.S. LNG export capacity
- TC Energy approves $1.5-B Columbia Gas expansion after profit tops estimates
- Baker Hughes’ fuel flexible NovaLT™ 16 gas turbine certified by RINA for marine propulsion
- Commonwealth LNG FID attracts global syndicate of leading banks
- Dozens injured, 18 missing after blast during restart at giant Qatar LNG site

Comments