Construction begins at Louisiana Calcasieu LNG plant
4/4/2019
Venture Global LNG Inc has started construction at its Louisiana Calcasieu liquefied natural gas (LNG) plant after receiving authorisation, a senior company executive said.
The Calcasieu Pass facility is designed to produce about 10 million tonnes per annum (mtpa) of LNG, or about 1.3 billion cubic feet per day (bcfd) of natural gas, said Michael Sabel, co-chief executive and co-chairman of Venture Global.
“We received our final FERC authorisation and DOE export authorisation,” he said at the LNG2019 conference in Shanghai, referring to approvals from the U.S. Federal Energy Regulatory Commission and the U.S. Department of Energy. (Reporting by David Stanway in SHANGHAI, writing by Jessica Jaganathan, editing by Richard Pullin)
Sign up to Receive Our Newsletter
- Cheniere signs deal with Bechtel to expand U.S. LNG export capacity
- TC Energy approves $1.5-B Columbia Gas expansion after profit tops estimates
- Baker Hughes’ fuel flexible NovaLT™ 16 gas turbine certified by RINA for marine propulsion
- Commonwealth LNG FID attracts global syndicate of leading banks
- Dozens injured, 18 missing after blast during restart at giant Qatar LNG site

Comments