Uniper agrees LNG bookings at Wilhelmshaven with ExxonMobil
1/25/2019
FRANKFURT, (Reuters) - German utility Uniper on Friday said it entered into a preliminary contract for the long-term booking of a substantial share of regasification capacity at a terminal yet to be built at Wilhelmshaven for receiving liquefied natural gas (LNG).
Discussions about LNG have flared up recently as the German government wants to diversify away from pipeline gas arriving from Russia, Norway and the Netherlands. Suppliers, most notably Qatar and the United States, have expressed interest.
The 10 billion cubic metres facility, a floating storage and regasification (FSRU) unit, could go into operation in second half of 2022.
Reporting by Vera Eckert, editing by Thomas Seythal
Sign up to Receive Our Newsletter
- Cheniere signs deal with Bechtel to expand U.S. LNG export capacity
- TC Energy approves $1.5-B Columbia Gas expansion after profit tops estimates
- Baker Hughes’ fuel flexible NovaLT™ 16 gas turbine certified by RINA for marine propulsion
- Commonwealth LNG FID attracts global syndicate of leading banks
- Dozens injured, 18 missing after blast during restart at giant Qatar LNG site

Comments