SNC-Lavalin awarded gas processing project in Delaware Basin
11/22/2017
MONTREAL — SNC-Lavalin is pleased to announce that it has been awarded the fabrication and supply of modular gas processing equipment for Producers Midstream LP (PMLP). The Maverick Gas Plant will be located in the Delaware Basin.
![]() |
| Photo courtesy of SNC-Lavalin. |
SNC-Lavalin's scope includes a state-of-the-art modular 60 MMscfd cryogenic gas plant capable of 99%+ propane recovery, mechanical refrigeration, condensate stabilization, tri-ethylene glycol (TEG) dehydration, amine treating, compression and associated balance of plant equipment. The facility is expected to commence operation in 1Q 2018.
This is the sixth gas processing plant SNC-Lavalin has built for the Delaware Basin in the last 2 yr and its 40th gas plant since 2011.
Sign up to Receive Our Newsletter
- Cheniere signs deal with Bechtel to expand U.S. LNG export capacity
- TC Energy approves $1.5-B Columbia Gas expansion after profit tops estimates
- Baker Hughes’ fuel flexible NovaLT™ 16 gas turbine certified by RINA for marine propulsion
- Commonwealth LNG FID attracts global syndicate of leading banks
- Dozens injured, 18 missing after blast during restart at giant Qatar LNG site


Comments