Wärtsilä to supply re-gasification system for Höegh LNG ship conversion
8/25/2016

Photo courtesy of Wärtsilä.
Wärtsilä has been contracted to supply the re-gasification system for an FSRU conversion project that Höegh LNG plans to carry out on a modern LNG vessel. The contract was signed in August.
The Wärtsilä re-gasification system to be supplied will feature re-gas technology using water glycol as the intermediate medium instead of propane. This provides a more compact solution being some 15% smaller and lighter than the propane based system.
The Wärtsilä scope of supply for this project comprises the water glycol re-gasification module, the water glycol /seawater heaters and pumps. Delivery is scheduled for autumn 2017.
Wärtsilä has previously supplied eight re-gasification systems to Höegh LNG.
Sign up to Receive Our Newsletter
- Cheniere signs deal with Bechtel to expand U.S. LNG export capacity
- TC Energy approves $1.5-B Columbia Gas expansion after profit tops estimates
- Baker Hughes’ fuel flexible NovaLT™ 16 gas turbine certified by RINA for marine propulsion
- Commonwealth LNG FID attracts global syndicate of leading banks
- Dozens injured, 18 missing after blast during restart at giant Qatar LNG site

Comments