Amec Foster Wheeler wins work on BP’s Forties gas pipeline system in UK
Amec Foster Wheeler has been awarded a contract by BP to provide operations, maintenance and project support for the Forties Pipeline System, which includes the Unity offshore platform and onshore pumping stations in Aberdeenshire and Perthshire, Scotland, and the Central Area Transmission System (CATS) terminal in Teesside in Northeast England.
The contract, worth over £50 MM ($74 MM), extends until January 2020 and will be managed from Amec Foster Wheeler’s Aberdeen offices.
The contract secures 90 jobs, including two apprenticeships (currently based at the CATS terminal).
“Amec Foster Wheeler has been supporting BP since 1995, and this 20-year relationship demonstrates the strength of our position in asset support services for the world’s leading oil producers," said Alan Johnstone, Amec Foster Wheeler’s managing director for upstream asset solutions.
"We look forward to continuing to partner with BP and deliver technical excellence, within safe and efficient operations," he added.
- Mitsubishi Heavy Industries Compressor acquires Swiss rotating equipment maintenance company AST Turbo AG
- Digital Exclusive: Evolving pressure relief valve designs protect LNG facilities
- Qatar’s Ras Laffan LNG hub hit by missile attack, ‘extensive damage’ reported
- JGC-Hyundai JV awarded EPC contract for major low-carbon LNG plant project in Papua New Guinea
- Iran attacks wipe out 17% of Qatar’s LNG capacity for up to five years

Comments