One train shut at Australia’s Ichthys LNG plant
8/23/2024
One of the two trains at the Ichthys liquefied natural gas (LNG) plant in Darwin, Australia, has been shut since August 20, operator Inpex Corp. said in an emailed statement on Thursday.
"Train 2 at Ichthys LNG was temporarily halted on the evening of August 20. The impact is currently being evaluated," Inpex said.
This is the plant's second train outage in the past month, after an outage in July.

Ichthys LNG is a joint venture between Inpex, TotalEnergies, and the Australian subsidiaries of CPC Corporation Taiwan, Osaka Gas, Kansai Electric Power, JERA and Toho Gas 9533.T.
The plant's processing trains can produce 8.9 metric MMtpy of LNG.
Related News
Related News
Sign up to Receive Our Newsletter
- U.S. natgas prices hit 20-week high on LNG flows, heat outlook
- Cheniere signs deal with Bechtel to expand U.S. LNG export capacity
- Baker Hughes’ fuel flexible NovaLT™ 16 gas turbine certified by RINA for marine propulsion
- Dozens injured, 18 missing after blast during restart at giant Qatar LNG site
- Commonwealth LNG FID attracts global syndicate of leading banks

Comments