SNC-Lavalin awarded gas processing project in Delaware Basin
11/22/2017
MONTREAL — SNC-Lavalin is pleased to announce that it has been awarded the fabrication and supply of modular gas processing equipment for Producers Midstream LP (PMLP). The Maverick Gas Plant will be located in the Delaware Basin.
Photo courtesy of SNC-Lavalin. |
SNC-Lavalin's scope includes a state-of-the-art modular 60 MMscfd cryogenic gas plant capable of 99%+ propane recovery, mechanical refrigeration, condensate stabilization, tri-ethylene glycol (TEG) dehydration, amine treating, compression and associated balance of plant equipment. The facility is expected to commence operation in 1Q 2018.
This is the sixth gas processing plant SNC-Lavalin has built for the Delaware Basin in the last 2 yr and its 40th gas plant since 2011.
Sign up to Receive Our Newsletter
- Gasum powers Equinor's platform supply vessel with bio-LNG
- ADNOC deploys pioneering AI-enabled process optimization technology
- Mexico Pacific announces long-term LNG SPA with POSCO International
- ONEOK to acquire Medallion and controlling interest in EnLink for $5.9 B
- Golar LNG signs EPC deal for $2.2-B MK II FLNG conversion project
- ONEOK to acquire Medallion and controlling interest in EnLink for $5.9 B
- Picarro launches handheld solution for natural gas leak investigation and closed-loop leak management
- Fincantieri LNG-powered Star Princess launched in Monfalcone
- Oman plans third LNG train, boosting domestic production to more than 15 MMtpy
- Brazil's fossil push undermines Lula's green ambitions
Comments