Gazprom to finish 1st line of Turkish Stream in March 2018
ABOARD THE PIONEERING SPIRIT SHIP, Russia (Reuters) — The first line of the Turkish Stream gas pipeline should be ready in March 2018 and the second line in 2019, Gazprom Chief Executive Alexei Miller told Russian President Vladimir Putin on Friday.
Courtesy of Gazprom. |
The first line of Turkish Stream should supply gas to Turkey solely, while the second aims to bring Russian gas via the Black Sea to southern and southeast Europe.
"I am here to take part in the start of work on the deep-sea part of the Turkish Stream pipeline," Putin told Turkish President Tayyip Erdogan by phone from the Pioneering Spirit pipeline-laying ship in the Black Sea.
Putin added that Turkey and Russia needed to agree on Turkish Stream's entry point.
Reporting by Denis Dyomkin; Writing by Katya Golubkova; Editing by Alexander Winning
- Gasum powers Equinor's platform supply vessel with bio-LNG
- ADNOC deploys pioneering AI-enabled process optimization technology
- Mexico Pacific announces long-term LNG SPA with POSCO International
- ONEOK to acquire Medallion and controlling interest in EnLink for $5.9 B
- Golar LNG signs EPC deal for $2.2-B MK II FLNG conversion project
- ONEOK to acquire Medallion and controlling interest in EnLink for $5.9 B
- Picarro launches handheld solution for natural gas leak investigation and closed-loop leak management
- Fincantieri LNG-powered Star Princess launched in Monfalcone
- Oman plans third LNG train, boosting domestic production to more than 15 MMtpy
- Brazil's fossil push undermines Lula's green ambitions
Comments