Technip Energies OQ’s Marsa LNG project in Oman
Technip Energies has been awarded a substantial contract by TotalEnergies and OQ for the Marsa LNG bunkering project located in Sohar, Oman.
The contract covers engineering, procurement and construction of a natural gas liquefaction train with an LNG production capacity of 1 MMtpy. The plant will use electric-driven motors instead of conventional gas turbines and will be powered by renewable electricity from a planned nearby solar farm which will cover 100% of the annual power consumption of the LNG plant. This is positioning the site as one of the lowest greenhouse gases intensity LNG plants ever built worldwide. The LNG produced will notably be used as a marine fuel to reduce the shipping industry’s carbon footprint.
The Marsa LNG project is an integrated complex developed by TotalEnergies (80%) and OQ (20%).
Arnaud Pieton, CEO of Technip Energies, commented, “The world’s net-zero trajectory will require LNG as a critical source of energy, while addressing emissions abatement. TotalEnergies and OQ’s progressive Marsa LNG project is an example of how we can decarbonize the LNG value chain by powering its production with renewable energy and using it as a marine fuel to reduce emissions linked to maritime transportation. By leveraging our innovation and global leadership in LNG infrastructure design and delivery, we are proud to support TotalEnergies and the Sultanate
Related News
Related News
- Gasum selects Wärtsilä for another bio-LNG project in Sweden
- Linde selected to supply carbon capture technology to ADNOC’S Hail and Ghasha project
- Tecnimont to build waste-to-biogas plant to fuel local kitchens in India
- Topsoe, Aramco sign JDA to advance low-carbon hydrogen solutions using eREACT™
- Indonesia regulator confirms disruption at bp's Tangguh LNG project
Comments