Chart Industries receives orders for Venture Global’s Plaquemines Phase 2 LNG project
3/30/2022
Chart Industries has received an order for the production of six brazed aluminum heat exchanger assemblies (BAHX) and cold boxes for Venture Global’s 10 MMtpy Plaquemines Phase 2 LNG export terminal project.
Chart booked the equipment order of $45 MM from Baker Hughes. This order is for the first six BAHX assemblies and cold boxes of the anticipated 18 BAHX assemblies and cold boxes for the full Plaquemines Phase 2 facility.
Sign up to Receive Our Newsletter
- Gasum powers Equinor's platform supply vessel with bio-LNG
- Oman plans third LNG train, boosting domestic production to more than 15 MMtpy
- ADNOC deploys pioneering AI-enabled process optimization technology
- Mexico Pacific announces long-term LNG SPA with POSCO International
- ONEOK to acquire Medallion and controlling interest in EnLink for $5.9 B
Comments