Gazprom to sign memo with Linde for third line of Ust-Luga LNG plant
12/24/2021
The board of Russia's Gazprom has approved signing a memorandum with Linde and RusKhimAlyans to build a third line at a LNG plant at the Baltic Sea port of Ust-Luga, Gazprom said on Friday.
The LNG plant is a part of a gas chemical complex that will include a plant with annual capacity to process 45 Bm3 of gas and a 13 MMtpy LNG plant. The complex is expected to start production in 2024-2025.
Sign up to Receive Our Newsletter
- Gasum powers Equinor's platform supply vessel with bio-LNG
- Oman plans third LNG train, boosting domestic production to more than 15 MMtpy
- ADNOC deploys pioneering AI-enabled process optimization technology
- Mexico Pacific announces long-term LNG SPA with POSCO International
- ONEOK to acquire Medallion and controlling interest in EnLink for $5.9 B
Comments