GTT receives two new LNG tanker orders
7/24/2019
Paris -GTT has received two new orders from the Hyundai group concerning the tank design of two LNGCs offering a capacity of 180,000 m3, for the first and 174,000 m3, for the second, on behalf of two ship-owners which names remain confidential at this stage.
The two LNGCs will be built in Hyundai Heavy Industries (HHI) and Hyundai Samho Heavy Industries (HSHI) shipyards in Korea.
GTT's Mark III Flex membrane containment system has been selected to equip the tanks of the vessels, the deliveries of which are scheduled between the fourth quarter of 2021 and the first quarter of 2022.
Sign up to Receive Our Newsletter
- Gasum powers Equinor's platform supply vessel with bio-LNG
- Oman plans third LNG train, boosting domestic production to more than 15 MMtpy
- ADNOC deploys pioneering AI-enabled process optimization technology
- Mexico Pacific announces long-term LNG SPA with POSCO International
- ONEOK to acquire Medallion and controlling interest in EnLink for $5.9 B
- ONEOK to acquire Medallion and controlling interest in EnLink for $5.9 B
- Picarro launches handheld solution for natural gas leak investigation and closed-loop leak management
- Oman plans third LNG train, boosting domestic production to more than 15 MMtpy
- Brazil's fossil push undermines Lula's green ambitions
Comments