CNOOC to build 6 storage tanks in Tianjin LNG terminal expansion
6/5/2018
CNOOC will start building six liquefied natural gas (LNG) storage tanks by the end of the year as part of a project to expand its Tianjin LNG terminal to help meet surging demand from households in northern China, CNOOC Gas and Power Group said in statement.
The project, including six tanks each with 220,000 cubic metres of storage capacity, 12 gasification units and 12 high pressure pumps, has been approved by CNOOC’s board members, the company said.
The new facilities are expected to start operating in 2022.
CNOOC’s Tianjin terminal is expected to have 7.25 million tonnes of annual LNG processing capacity by 2030, up for 3.21 million tonnes in 2018.
(Reporting by Meng Meng and Aizhu Chen Editing by Joseph Radford)
Sign up to Receive Our Newsletter
- Gasum powers Equinor's platform supply vessel with bio-LNG
- ADNOC deploys pioneering AI-enabled process optimization technology
- Mexico Pacific announces long-term LNG SPA with POSCO International
- ONEOK to acquire Medallion and controlling interest in EnLink for $5.9 B
- Golar LNG signs EPC deal for $2.2-B MK II FLNG conversion project
- ONEOK to acquire Medallion and controlling interest in EnLink for $5.9 B
- Picarro launches handheld solution for natural gas leak investigation and closed-loop leak management
- Fincantieri LNG-powered Star Princess launched in Monfalcone
- Oman plans third LNG train, boosting domestic production to more than 15 MMtpy
- Brazil's fossil push undermines Lula's green ambitions
Comments