Statoil: Ireland's Corrib gas outage extended to Oct. 4
10/2/2017
OSLO (Reuters) — An ongoing reduction in the output of Ireland’s Corrib gas field has been extended by another 24 hr to Oct. 4 at 0600 CET (0400 GMT), Norway’s Statoil said in a statement.
The Corrib field’s output will still be reduced by 9.9 MMcm per day. Statoil did not say why the outage was extended.
Reporting by Terje Solsvik, editing by Gwladys Fouche
Sign up to Receive Our Newsletter
- Gasum powers Equinor's platform supply vessel with bio-LNG
- ADNOC deploys pioneering AI-enabled process optimization technology
- Mexico Pacific announces long-term LNG SPA with POSCO International
- ONEOK to acquire Medallion and controlling interest in EnLink for $5.9 B
- Golar LNG signs EPC deal for $2.2-B MK II FLNG conversion project
- ONEOK to acquire Medallion and controlling interest in EnLink for $5.9 B
- Picarro launches handheld solution for natural gas leak investigation and closed-loop leak management
- Fincantieri LNG-powered Star Princess launched in Monfalcone
- Oman plans third LNG train, boosting domestic production to more than 15 MMtpy
- Brazil's fossil push undermines Lula's green ambitions
Comments