High-output gas well commissioned at Umid field
A high-output gas-condensate well of Umid field, the well No 14, became operational after drilling started in March 2015 to develop the field’s resources and prove capacity of its north-western part. It has 6352-m depth reaching VII horizon of productive layer.
Photo Courtesy of SOCAR. |
Following the perforating work to a depth of 6317-6282 meters it was put in commission with the daily output of 600 000 cubic meters of gas and 100 t of condensate. It is planned to increase output phase by phase in near future and put it into optimal operation. The gas well is expected to produce one million cubic meters of gas and 150 t of condensate a day. It affords ground for installation of new platforms to develop north-western part of the field.
Umid’s two wells produce (No 10 and 12) 750 000 cubic meters of gas and 230 t of condensate a day.
- Gasum powers Equinor's platform supply vessel with bio-LNG
- ADNOC deploys pioneering AI-enabled process optimization technology
- Mexico Pacific announces long-term LNG SPA with POSCO International
- ONEOK to acquire Medallion and controlling interest in EnLink for $5.9 B
- Golar LNG signs EPC deal for $2.2-B MK II FLNG conversion project
Comments