Total begins production at Icahuasi gas field

Total has put onstream the Incahuasi gas and condensate field, the Group’s first operated development in Bolivia, with a production capacity of 50 Mboe/d.

The Incahuasi field lies at more than 5,600 meters beneath the Andean foothills, 250 kilometers from the city of Santa Cruz de la Sierra. The first phase of the field development involves three wells, a gas treatment plant and 100 kilometers of associated export pipelines. The second phase of development, involving three further wells, is currently under consideration.

Incahuasi is situated in the Aquio and Ipati blocks. The development is operated by Total (50%), with partners Gazprom (20%), Tecpetrol (20%) and YPFB Chaco (10%).

Comments

{{ error }}
{{ comment.comment.Name }} • {{ comment.timeAgo }}
{{ comment.comment.Text }}